Getting fencing quotes

Getting fencing quotes: what to ask, and what to watch for

Most people get two or three quotes for a fence and find they can’t compare them. One is a single number, one is itemised, one has a line called “allowance” and no explanation.

This is what you’d be told by a friend in the trade before you started ringing around — including the questions worth asking the team here.

What a complete fencing quote contains

The length, and where it runs Back, sides, front, stated separately.
Material, height and colour, specifically “Colorbond” isn’t a specification. A profile, a height and a colour is.
Removal and disposal of the old fence And whether the old footings are included or excluded.
Posts and concrete What goes in the ground, and how deep.
Gates, each one, with the hardware A gate is the single biggest variable in most fencing quotes.
Site clean-up Stated, not assumed.
What’s excluded In writing.

If a quote is one number with no breakdown, you can’t tell whether it’s cheaper because it’s better value or because something’s missing.

The four questions worth asking everyone who quotes

“What have you allowed for the old footings?” On an established block there’s usually far more concrete in the ground than anyone expects, and it’s the most common reason a fencing job comes in over the quote. Someone who has looked will have an answer. Someone who hasn’t will say “we’ll see when we get there” — which is fine, as long as you know that’s what you’ve agreed to.
“Is this a repair or a replacement job?” If the posts are sound at ground level, a repair may be the better job and a much smaller one. Somebody who only ever quotes replacements isn’t looking.
“What happens to my yard overnight?” If the job runs more than a day, the old fence is down and the yard is open. Ask what happens about that, especially with a pool or a dog.
“What’s not included?” The most useful question on this page. Everyone has exclusions. The difference is whether you hear them now or on day two.

Why two quotes can be thousands apart

Usually one of these, and rarely because someone is trying it on.

Footings Allowed for, or discovered later.
Access Machine to the fence line, or everything barrowed by hand.
The fall across the block Raked panels take longer than a flat run.
Gate count and type A driveway gate is not a pedestrian gate.
What’s excluded The cheaper quote often just contains less.

Before you ring anyone

Have a rough idea of where the fence runs, whether it’s a shared boundary, whether an old fence is coming out, and whether a machine can get down the side. You’ll get more accurate quotes and fewer surprises.

If it’s a shared boundary and you haven’t spoken to your neighbour yet — that’s normal, and it’s worth understanding how that works before you get quotes at all. Ask below.

Or start with a free measure

1300 536 700 Written itemised quote, and no chasing afterwards.